Exhibition Stand Builder for UK Construction Week London
UK Construction Week London runs 11–13 May 2027 at ExCeL London, as part of the UK Built Environment Super Event alongside Futurebuild and the Stone & Surfaces Show. We design and build exhibition stands for it: product-led stands planned around a working demonstration or a heavy exhibit, on the DUM FLEX™ frame or in bespoke joinery, at any footprint. EKA Elevator's 45 m² stand on that floor is one of ours.
Get a quote →Our work at UK Construction Week London
A 45 m² product stand for EKA Elevator: open corners so it stayed approachable from every aisle, product graphics and digital content, informal seating, and blue LED strip lighting integrated into the DUM FLEX™ profiles so the structure itself became the brand feature. Open the project and look at it.
A construction stand is built around what the visitor can touch
The people walking the aisles at UK Construction Week London are contractors, housebuilders, engineers, specifiers and site teams. They trust what they can operate, and a stand here is designed around the product before it is designed around the brand.
A working product beats a picture of one
A demonstration that runs, a section of cladding a visitor can lift, a tool they can pick up, a screen that shows the installed job: these do more than any graphic at a construction show. Designing for that means planning plinths, power, load and a route around the demonstration from the first drawing, so the product sits where people can reach it without blocking the way through. The demonstration is on the first sheet of the drawing, not the last.
Heavy exhibits need a plan before they need a plinth
Lifts, plant, machinery sections and stone samples are heavier than most exhibits. A heavy display has to be positioned, supported and confirmed with the venue before build-up, including how it comes into the hall and whether it can be moved once it is on the stand. We work that out with you at the design stage, because a demonstration that cannot be placed where the drawing shows it is a stand that is redesigned on site.
Light in the structure, not on top of it
For EKA Elevator the stand was built on the DUM FLEX™ profile system with blue LED strip lighting integrated directly into the profiles, so the frame itself became the visual feature and the stand read as one illuminated object from across the hall. Integrated lighting keeps the floor clear of fittings and cables, which matters on a product stand where visitors are moving around the display. The same approach works in bespoke joinery, where the light is built into the structure at the workshop.
UK Construction Week London is one of two editions, and the difference matters
UK Construction Week is one brand with two editions, and the London one has grown into something larger than a single show. Knowing which edition you are booking, and what sits under the same roof, changes the stand you need.
London at ExCeL in May, Birmingham at the NEC in the autumn
The organiser, Media 10, runs UK Construction Week as a London edition at ExCeL in May and a Birmingham edition at the NEC in the autumn. The two draw from different regions and different parts of the industry, and an exhibitor who books London expecting the NEC hall, or the other way round, ends up with the wrong stand for the room. This page is about the London edition; for the Birmingham venue, see our Birmingham page. An exhibitor taking both can plan one design for two floors: the DUM FLEX™ frame is ours and returns to our stock between projects, so the structure is reused and, where dimensions and artwork stay the same, the graphics often come back with it.
Three shows under one roof in London
From its 2026 edition the London show has run as the UK Built Environment Super Event, bringing UK Construction Week London, Futurebuild and the Stone & Surfaces Show together at ExCeL. The organiser reported more than 20,000 built-environment professionals, 600 or more speakers and around 47,000 leads for exhibitors at that first combined edition. The floor is grouped by sector: roofing, cladding and insulation; equipment, tools and hire; building and onsite safety; digitalisation; and the Futurebuild innovation showcase. In practice your aisle carries visitors who came for a different show, and a stand that only speaks to its own sector misses a good part of the traffic walking past it.
Being seen in a Super Event aisle
A hall holding three shows is a busy hall. The stands that work here are the ones a visitor can read from the aisle, walk into without asking, and leave with a reason to follow up.
Open corners, and a route through the stand
EKA Elevator's brief was a compact space that stayed approachable from the surrounding aisles while carrying product graphics, digital content and informal conversations. The layout used open corners so there was no wall between the visitor and the stand, illuminated branding for the long view, and product communication panels positioned along a clear route through the space. On 45 m² that gave a stand people could walk into without being invited, which at a construction show is most of the job. On a larger footprint the same logic holds: an open frontage, a demonstration visible from the aisle, and the meeting space behind it rather than in front.
Height, and the long view
In a hall this size the first read happens from twenty metres away, and it is done by whatever stands above head height: an illuminated header, a hanging banner rigged through the venue, or a product tall enough to be its own sign. The organiser's manual sets what can be built to and what has to be submitted for approval; we design to that manual for the edition you have booked and put the tall element in for approval with the stand plan on the same submission date.
Building at ExCeL for a construction show
The London edition is at ExCeL, and ExCeL has its own way of doing things that sits on top of the organiser's manual. Construction exhibitors used to other halls tend to meet three of them.
Vehicles, passes and rigging
Deliveries into ExCeL are booked into timed slots through the venue's vehicle system, everyone on site during build-up carries a contractor pass, and rigging above the stand is ordered through the venue. The venue rules themselves, and the way we work around them, are on our ExCeL London page.
The paperwork is part of the build
Space-only stands carry the same documents here as anywhere else: dimensioned drawings, structural detail where the design calls for it, a risk assessment and method statement, and material certificates. We prepare that pack as part of the project and submit it to the organiser's dates, so approval is on the programme with a date against it. Our fabrics carry their flame-retardancy certificates and our paints and adhesives are water based.
One team from brief to breakdown
For the EKA stand we ran the whole project: design development, technical planning, production, graphics, lighting integration, logistics, installation, on-site delivery and dismantling. That is how we work at UK Construction Week London for any size of stand, in bespoke joinery from our own workshop or on the DUM FLEX™ frame, with our crew in the hall for build-up and breakdown. Both approaches are described on our bespoke and modular stands pages.
Exhibiting at UK Construction Week London: the questions we get asked
When and where is UK Construction Week London 2027?
11–13 May 2027 at ExCeL London, as part of the UK Built Environment Super Event with Futurebuild and the Stone & Surfaces Show. Dates and venue are published by the organiser on ukconstructionweek.com; we design to the exhibitor manual for that edition.
Is UK Construction Week in London or Birmingham?
Both. It is one brand with two editions: London at ExCeL in May and Birmingham at the NEC in the autumn. They draw different visitors and sit in different halls, so the stand is designed for the edition you have booked. If you take both, a DUM FLEX™ stand can be designed once and built at both from the same frame in our stock, with the graphics coming back where dimensions and artwork stay the same.
Can we show a working product or a heavy exhibit on the stand?
Yes, and it should be planned first. A working demonstration needs power, load and a visitor route around it drawn into the stand, and a heavy exhibit needs its position and floor loading confirmed with the venue before build-up. That is worked out at the drawing stage.
Who visits UK Construction Week London?
Contractors, housebuilders and developers, engineers, specifiers and site teams, alongside the Futurebuild and Stone & Surfaces audiences under the same roof. The organiser reported more than 20,000 built-environment professionals at the first Super Event. They come to see product and ask technical questions, and the stand should make both easy.
How early should we appoint a stand builder for UK Construction Week?
As soon as the plot is confirmed. Stand plans, rigging and health and safety documents have deadlines in the organiser's manual that fall weeks before the show, and ExCeL's vehicle slots are booked ahead. Early appointment puts the design, the approvals and the logistics on one programme.